We use cookies to make your experience better. To comply with the new e-Privacy directive, we need to ask for your consent to set the cookies. Learn more.
Share this :
Print
Eisco Labs Dynamics System Kit - Starter set for Physics / Mechanics
Eisco Labs Eisco Dynamics System 1 X 1.2m Track With Pulley, 1 Trolley Standard, 1 X Trolley Spring Loaded, 2 X Masses, 10 X 10 G Masses, 1 X Ticker Tape Timer, 5 Spare Tapes, 1 X Pack Of Carbon Discs, 1 Reel Of Cotton, 1 X Spirit Level - ESCO
List Price
$279.51
Your Price
$279.51
HOW MUCH YOU SAVE:
0.00 %
![](https://netam2po.netascientific.info/media/skin/seal2.png)
![](https://netam2po.netascientific.info/media/skin/seal.png)
NETA PART: | ESCO-DYSYS |
MFG.PART: | DYSYS |
UNSPSC: | 41122800 |
Manufacturer: | Eisco Labs |
- An economical way to teach dynamics including, but not limited to, position, velocity, acceleration, force, elastic and in elastic collisions, momentum, conservation of energy, and much more.
- The kits contains 1 - 1.2m Track with pulley, 1 - Trolley Standard, 1 - Trolley Spring loaded, 2 - Masses, 10 x 10 g Masses, 1 - Ticker tape timer, 5 - Spare tapes, 1 - Pack of carbon discs, 1 - Reel of cotton, 1 - Spirit level 1 - Stopwatch
Eisco Labs Dynamics System Kit An economical way to teach dynamics including, but not limited to, position, velocity, acceleration, force, elastic and in elastic collisions, momentum, conservation of energy, and much more. If you are looking to get started teaching physics, or need to revamp your mechanics labs this is the perfect kit. The kits contains 1 - 1.2m Track with pulley, 1 - Trolley Standard, 1 - Trolley Spring loaded, 2 - Masses, 10 x 10 g Masses, 1 - Ticker tape timer, 5 - Spare tapes, 1 - Pack of carbon discs, 1 - Reel of cotton, 1 - Spirit level 1 - Stopwatch
Power supply required but sold separately. Recommended power supply, EPR1323C.
SKU | ESCO-DYSYS |
---|---|
Supplier Part Number | DYSYS |
UM | EA |
UNSPSC | 41122800 |
Manufacturer | Eisco Labs |
ProductLine | ESCO |
Qty | 1 |
MinOrderQty | 1 |
Weight | 7.00 |
Lead Time | 5 Business Days |
Hazardous | N |